1. Site Preparation
Bonded Floor
- Any cracks in the floor must be repaired. If there are any, they will show through and crack the bonded screed which is why it is important to start with a smooth surface.
- The day before Cemfloor is installed, a coat of quality bonding agent needs to be applied to the surface. This must be allowed to dry overnight.
- An hour before we arrive a second coat of bonding agent is applied to the floor. This needs to be slightly tacky to ensure a good fixing.
Unbonded Floor
- Insulation sheets must be tightly fitted to ensure they are not loose when you walk on them.
- Cover the insulation with a quality polythene sheeting. This needs to be stretched until there are no creases and overlapping with the perimeter walls by a minimum of 75mm.
Underfloor Heating
- Check the floor insulation sheets are correctly fitted. If there are any gaps at this stage, thermal bridging can happen to the subfloor. If there are any gaps fill with a quality expanding foam.
- Cover the area with polythene sheets. These need to be stretched and overlapping with the perimeter wall by a minimum of 100mm.
- The heating system specifications will detail the requirements of the minimum edge expansion strip. The design will state you need to use 7mm or 25mm insulation strips.